Tunjukkan catatan dari 2020Papar semua
Contoh soalan akhir Level 3 Paip dan gas
Syarikat minyak dan gas di Malaysia.
Gaji pekerja Offshore Oil & Gas
VALVE PRESSURE TEST
GERUDI MUDAH ALIH
ARRANGE PIPE LIFTING (part 2)
ARRANGE PIPE LIFTING (Part 1)
 PIPING STANDARDS CODES
PENETAPAN GARISAN (LINE ARRANGEMENT)
PROSEDUR PEMERIKSAAN PIPE SPOOL
GTAW (part 4)
GTAW (part3)
GTAW (Part 2)
GTAW (Part 1)
Corrosion (pengkaratan) paip.
Phased Array Ultrasonic Testing (PAUT)
Jenis-jenis paip dan klasifikasi.
PENYEDIAAN LUKISAN KERJA (SHOP DRAWING) PART 4
PENYEDIAAN LUKISAN KERJA (SHOP DRAWING) PART 3
PENYEDIAAN LUKISAN KERJA  (SHOP DRAWING) PART 2
PENYEDIAAN LUKISAN KERJA  (SHOP DRAWING) PART1
Welding Symbols
 KEPERLUAN UNTUK KERJA FABRIKASI PAIP.
PROSES DALAM FABRIKASI PIPE (SPOOL)
KAWALAN DOKUMENTASI FABRIKASI PAIP
Jadual perancangan tenaga kerja (Microsoft project)
CARA PEMBUATAN PAIP
TEST PRESSURE (PART 5)
Test Pressure (part 4)
 Test Pressure. (part 3)
TEST PRESSURE (part 2)
Test pressure (part 1)
  IN-PROCESS QC REQUIREMENTS AND PROCEDURES (PART 2)
IN-PROCESS QC REQUIREMENTS AND PROCEDURES (PART 1)
Contoh soalan peperiksaan  L-4
Contoh soalan Peperiksaan L-3
PIPE SPOOL FINAL INSPECTION (part 1)
PERFORM ALIGNMENT CHECKING DURING PIPE FIT UP.
pipe fit-up inspection (part 2)
PIPE FIT-UP INSPECTION
Material Take off (MTO)
Quality Assurance Manual In-process Qc Procedures (part 4)
Quality Assurance Manual (ITP) Part 3
  QUALITY ASSURANCE MANUAL (part 2)
QUALITY ASSURANCE MANUAL (part 1)
Keadah membuat Kertas kerja  Pra-Presediaan Kerja pemasangan paip
ARRANGE SCAFOLDING LOCATION
PENGIRAAN PIPE offset (Part 3)
Teknik atau Kaedah Penjajaran Pipe (Pipe Alignment)
Pengenalan kepada peralatan Asas Fabrikasi Paip (Pipe Fit-up) (PART 2)
Pengenalan kepada peralatan Asas Fabrikasi Paip (Pipe Fit-up) (PART 1)
Pengendalian bahan (transportation) part 2
PENGENDALIAN  BAHAN (Transportation) Part 1
Pengiraan paip (part 2)